California-specific

How California overtime rules change the math

Federal FLSA pays 1.5× after 40 hours per week. California stacks four additional rules on top — and each one compounds.

Rule 01

1.5×

hours 9–12 each day

Daily OT after 8 hours

Anyone working 8+ hours on a single day earns 1.5× on hours 9–12. Doesn't matter if they're under 40 for the week.

Rule 02

hour 13+ each day

Double-time after 12 hours

Hours 13+ in a day are 2× — and that adds up fast on a long Saturday close. One extra hour = double pay.

Rule 03

1.5–2×

full day 7

7th-consecutive-day premium

First 8 hours of a 7th-straight workday are 1.5×; beyond that, 2×. The schedule that looks fine on paper gets expensive fast.

Rule 04

+1 hr

per missed break

Meal break penalty

A missed meal break triggers a 1-hour penalty at the regular rate. Common, expensive, and almost always invisible in the schedule.

1 of 4 rules

1.4–1.7×

harder than equivalent operators in the rest of the country. That's the wedge — every avoided OT hour is worth more here.

Free resource

The checklist every smart operator runs before publishing a schedule.

12 steps. The scheduling audit that catches overtime leaks, shift overlaps, and coverage gaps before they hit your payroll. Drop your email and it's yours, no signup required.

Downloaded by 10,000+ operators

No spam. One email. Unsubscribe anytime.